Project Location: Takoradi Port, Ghana
Client: GENSER ENERGY
Objective
WACAMS is to reclaim 3.0ha to construct a new fuel export terminal as detailed in the terms of reference below:
Tasks
- Submission of work documentation
a. Detailed Method Statement and Risk Assessment
b. Inspection and Test Plan
c. Equipment, Tools and Manpower Certification
2. Engineering, procurement and construction of a 390m multi-layer and
385m single layer revetment.
3. Environmental Monitoring